Sydney GeotechnicalRequest a Working Platform Assessment

Sydney & New South Wales

Working Platform Assessments & Earthworks Sydney

A suitable working platform helps construction plant operate on stable, maintainable ground. We assess subgrade conditions and provide practical platform recommendations for piling rigs, cranes and other heavy construction equipment across Sydney and NSW.

Indicative feeScope-basedPrimary referenceBR 470 plant-loading guidance; AS 3798 where controlled fill or earthworks verification appliesCoverageGreater Sydney & NSW

When this service is useful

The right scope depends on your development, site access, ground conditions and the information needed by your project team. This service is commonly used for:

  • Piling and drilling rigs
  • Mobile cranes and heavy tracked plant
  • Construction sites with fill, soft ground or variable subgrade
  • Projects requiring platform thickness, material or verification recommendations

Piling-rig, drilling-rig and crane platform ground assessment

A working-platform assessment considers the proposed plant loading, track or outrigger configuration, underlying subgrade, platform material and operating conditions. A platform that is suitable for one rig or loading case cannot automatically be assumed suitable for another.

Western and South West Sydney development sites may include fill, weathered shale, reactive clay, soft ground or changing moisture conditions. Drainage, earthworks quality, platform maintenance and changes in plant position can materially affect the assessment.

Important project and ground considerations

  • Plant model, operating weight, track or outrigger loads and intended movements
  • Subgrade strength, fill variability, groundwater and wet-weather exposure
  • Platform build-up, material, drainage, maintenance and exclusion zones
  • Earthworks testing or construction-stage verification where specified

What the assessment can include

  • Review of plant configuration, track or outrigger loads and operating area
  • Site walkover and targeted subgrade investigation
  • Assessment of ground strength and credible platform failure mechanisms
  • Platform material, thickness, drainage and maintenance recommendations
  • Construction verification requirements and exclusion-zone considerations where relevant

What you receive

  • Defined assessment assumptions and plant loading information
  • Interpreted subgrade conditions
  • Platform build-up and material recommendations
  • Inspection, testing and maintenance requirements
  • Clear limitations and triggers for reassessment

What to provide for your quotation

The clearest quote starts with enough information to understand your actual project, site constraints and required deliverables.

  • Plant manufacturer, model, operating weight and loading information
  • Platform layout, operating area and intended construction sequence
  • Available geotechnical reports, earthworks records and site photographs
  • Any contractor, principal or project-specific verification requirements

Working Platform & Earthworks Assessments across Sydney and NSW

Working-platform assessments can be scoped for piling, drilling and heavy-plant projects across Western Sydney, South West Sydney, Macarthur, Greater Sydney and the Illawarra. Ground conditions and approval requirements must always be considered site by site.

Frequently asked

Working Platform & Earthworks Assessments questions

When does a construction site need a working-platform assessment?+

A builder, piling contractor or plant operator may request an assessment when heavy rigs, cranes or tracked equipment will work on fill, soft ground, variable subgrade or a purpose-built platform. The required scope depends on the plant loading and actual site conditions.

Is AS 3798 a working-platform design standard?+

No. AS 3798 concerns earthworks and controlled fill where applicable. Working-platform assessment must also consider project-specific plant loading, the subgrade, suitable technical guidance such as BR 470 where appropriate, and inspection and maintenance requirements.

What plant information is required?+

Provide the manufacturer, model, operating weight, track or outrigger dimensions, maximum ground bearing pressure and the intended operating configuration. The assessment can only address the supplied loading case.

Does a platform assessment replace daily site checks?+

No. Platforms require drainage, maintenance and routine inspection. Damage, pumping, rutting, saturation or changed plant loads should trigger review before continued operation.

Can an existing platform be assessed?+

Yes, subject to access and available construction records. Targeted inspection and testing may be needed to confirm the platform and underlying subgrade.